Date: March, 2016
Location: Cleveland, OH
Contractor: Expert Basement Repair
Engineer: N/A

Stabilization horizontal cracking in glazed tile foundation

Stabilization horizontal cracking in glazed tile foundation.

Observation: Due to the amount of grinding on glazed tile, an additional Hepa vacuum was used to control dust level. Extra epoxy was also used for evening the ground area allowing a smooth painted completed project.

Lots of grinding was needed with unevenness of the Glazed Tile. Strap installation spacing was tightened to 32” on center. Also with large span of window opening, horizontal straps were installed to carry load to vertical straps placed on each side of window.