Commercial
Milwaukee Double T Parking Garage
Fortress Stabilization Case Study Milwaukee Double T Parking Garage The parking garage at the Tosa Center Medical Clinic experienced failed welds of the 3.5″ JVI flanges, which is a…
Read MoreVirginia Box Culvert
Fortress Stabilization Case Study Virginia Box Culvert A new precast box culvert bridge was set in place to replace an old bridge beyond repair. The Virginia Department of Transportation…
Read MoreHotel Parking Garage
Fortress Stabilization Case Study Hotel Parking Garage Failure of steal and welds due to corrosion, tension, and shear stress required seam maintenance of the Double Tee parking garage. Double…
Read MoreRetail Center Slab Crack Repair
Fortress Stabilization Case Study Retail Center Slab Crack Repair This large retail center was experiencing severe cracking in multiple areas. The contractor installed approximately 1,000 Crack Stitches as part…
Read MoreFactory to Hotel Conversion
Fortress Stabilization Case Study Factory to Hotel Conversion This industrial building, originally built in 1926, was being re-purposed into a hotel. The load demands for occupancy and dining facilities…
Read MoreInterstate 95 Florida Skate Park
Fortress Stabilization Case Study Interstate 95 Florida Skate Park The Miami Park Authority in cooperation with The Nick Katz Charitable Foundation partnered together to build several skate parks under…
Read MoreWall Shear
Fortress Stabilization Case Study Wall Shear Project Scope: Residential block foundation built in 1930s. All walls were in various modes of failure. Slab and footer were poured monolithic. Two walls…
Read More