Virginia Box Culvert
A new precast box culvert bridge was set in place to replace an old bridge beyond repair. The Virginia Department of Transportation has utilized Fortress Kevlar® for over ten years and turned to it again as a waterproofing membrane for this project. The Kevlar® was saturated with a two-lift epoxy combined with a #9 Basalt…
Read MoreHotel Parking Garage
Failure of steal and welds due to corrosion, tension, and shear stress required seam maintenance of the Double Tee parking garage. Double Tee “hotshot” Anchors were utilized to reinforce the seams, combined with new welds and sealant. Single layers of 300 GSM unidirectional fabric were wrapped at beam ends, anchored by Fortec Carbon Staple Anchors,…
Read MoreRetail Center Slab Crack Repair
This large retail center was experiencing severe cracking in multiple areas. The contractor installed approximately 1,000 Crack Stitches as part of the overall space remodel. As the images show, stitches were installed roughly 12″ apart, perpendicular to the crack to maximize the tensile strength of the carbon fiber and prevent future crack expansion. The cracks…
Read MoreFactory to Hotel Conversion
This industrial building, originally built in 1926, was being re-purposed into a hotel. The load demands for occupancy and dining facilities required that reinforcement be installed on all floors. Fortress ReGrid carbon Kevlar® straps were chosen, and a total of over 4,000 feet was installed in 33′ spans. Each span took less than 25 minutes…
Read MoreInterstate 95 Florida Skate Park
The Miami Park Authority in cooperation with The Nick Katz Charitable Foundation partnered together to build several skate parks under the I95 freeway viaducts. A construction error occurred in one of the parks in Miami as contractors drilled into structural girders to hang lighting. FDOT required the removal of the lighting and that the area…
Read MoreWall Shear
Project Scope: Residential block foundation built in 1930s. All walls were in various modes of failure. Slab and footer were poured monolithic. Two walls were deemed too far out of tolerance to repair and were therefore replaced. Solution: InvisiBeam Carbon Kevlar straps with top anchor and bottom anti-shearing anchor were used on remaining walls, which…